top of page

How Long Does a Solar Panel Pigeon Proofing Installation Take?

Sep 10
1 min read

Updated: Nov 3

The time needed to pigeon proof solar panels depends on the size and layout of the system, roof access, and how much cleanup is needed before the mesh can be installed.




How Long Does a Solar Panel Pigeon Proofing Installation Take?



Many Jobs Can Be Completed in One Day


A typical residential solar panel pigeon proofing project can often be completed in one day.

Larger or more complicated roofs may take longer.



What Affects the Installation Time?


Some of the biggest factors include:

  • Number of solar panels

  • Total perimeter that needs mesh

  • Multiple separate solar arrays

  • Roof height and steepness

  • Panels located close to roof edges

  • Amount of pigeon nesting and droppings

  • Additional nesting areas around eaves or rooftop equipment


A home with significant pigeon activity usually requires more preparation than a roof where birds have only recently started nesting.



Cleanup Can Take a Significant Amount of Time


If pigeons have been living underneath the panels, nests, feathers, droppings, and other debris may need to be removed before the exclusion work is completed.




Installing the Mesh


After the area is prepared, bird mesh is fitted around the accessible perimeter of the solar array to physically block pigeons from getting underneath.


Cheetah uses black PVC-coated galvanized steel solar panel bird mesh with metal solar panel clips.



Every Roof Is Different


A simple array with little cleanup may be relatively quick, while a large multi-array system with years of nesting can take considerably longer.


The best estimate comes from looking at the solar layout, roof, and severity of the pigeon problem before the job begins.

 
 
 

Comments


bottom of page